|
- 1 -
1–10 203(k) – Rehabilitation Program
- 2 -
203(k) Program
Appraiser
Borrower
Eligible Improvements
Ineligible Improvements
Plan Reviewer
223(E) Program
- A -
Acceptability Criteria
Access
Accessory Unit
Definition
Definitiona (cont.)
Utility Requirements
Adjusted Sale Price
Adjustments
Explanation
Support for
Age on the URAR
Airport
Existing Construction
New and Proposed Construction
Noise and Hazards
Special Hazards
Appliances
Applicant Review
Application for Register
Appraisal
Expiration of
Appraisal Fees
Appraisal Forms
Appraisal Monitoring
Appraised Value
Reconsideration of
Appraiser
Qualifications
Requirements
Appraiser credentials
Appraiser Information
Assumptions
- B -
Basement
Bedroom
Egress
Builder's Certification
- C -
Car Storage
Category of Construction
Certification
Client Information
Community Services
Comparable Data Pool
Comparable Sales
Confirmation
Comparable Sales Selection
Competitive Sites
Conditions Not Requiring Repairs
Construction
Category of
Construction Status
Contractual Responsibility of Appraisers
Cost Approach
Required
Covenants
Restrictive
Crawl Space
CVP
- D -
Data Plate
Defective Conditions
Departure
Design
Disclaimer
Drainage
- E -
Easements
Economic Trends
Effective Date
Electricity
Encroachments
Energy Efficiency
Existing Construction
Exterior Materials
- F -
Fees
Appraisal
Inspection
FHA
Data Plate
FHA Register
Final Inspection
Final Reconciliation
Flipping
Flood Hazard Areas
Condominium
Existing Construction
New and Proposed Construction
Forms
Appraisal
Foundation
Foundations
Fumes
Functional of the Appraisal
Future Utility
- G -
Gas Wells
Abandoned
General Acceptability Criteria
Grading and Drainage
Gross Living Area
Gross Rent Multiplier
- H -
Hazards
Health and Safety Deficiencies, Other
Heating
Heavy Traffic
High Pressure Gas
HOC Reference Guide
1–1 Purpose and Scope
1–2 Basic Eligibility References
1–3 Gross Rent Multiplier
1–4 Appraising Refinances
1–5 Fees: Appraisal & Inspection
1–6 Expiration of Appraisals
Home Equity Reversion
Homebuyer Summary
HUD
Data Plate
Hydrogen Sufide Gas
- I -
Income Approach
Adjustment Process
Data Requirements
Development of Rates
Income Projection
Lease Confirmation
Information
Appraiser
Client
Inharmonious Land Uses
Inoperative Well
Intended Use
Intended Use of Appraisal
Intended User
Interior Materials
Isolated Sites
- L -
Lead Based Paint
Lead–Based Paint
Lender Selection of Appraiser
Limiting Conditions
Lot Appraisals
Manufactured Homes
- M -
Manfactured Homes
Manufactured Home Loan Program
Manufactured Homes
Market Value
Marketability
Mechanical Chlorinators
Mechanical Systems
Minimum Property Standards
Mobile Homes
Personal Property Classification
Property Description
Propertyh Standards
- N -
Narrative Comments Section
Natural Physical Features
Neighborhood
Boundaries
Buildings
Change Consideration
Character
Character of Structures
Hazards
Nuisances
Nuisances
- O -
Offensive Noises and Odors
Off–Site Improvements
Oil Wells
Abandoned
Existing Construction
New and Proposed Construction
Other Health and Safety Deficiencies
Outlying Sites
Overhead High–Voltage Transmission Lines
- P -
Planned Unit Development
Plans
Lender to Provide
Plans and Specifications
Plumbing System
Private Road Access and Maintenance
Property Analysis
Property Flipping
Property Rights
Proposed Construction
Protective Covenants
Purpose of the Appraisal
- Q -
Quick Tips
- R -
Reconciliation
Reconsideration of Appraised Value
Record Keeping
Refinance
Remedies
Residential Use
Predominate
Restrictions
Land Use
Reverese Mortgage
Roof
Roofing
- S -
Sale by Owner of Record
Sale History
Appraiser Responsibility
Sales Compararison Approach
Adjustment Process
Data Requirement
Sanctions
Scope of Work
See also VC–1K
Selection of Appraiser
Septic Tank
Soil Contamination
Sewage Systems, Individual
Sewer System
Site Analysis
Site Hazards
Site Requirements
Slus Pits
Small Community Market Preferences
Smoke
Soil Contamination
Other Soil Contaminants
Septic and Sewage
Underground Storage Tanks
Solar Energy
Appraisal Procedure
Limit to Value
Responsibility to Temporary Limit
Solar Hot Water Systems
Temporary Procedure
Space Requirements
Stationary Storage Tanks
Streamline Refinance
Streets
Structural Conditions
Subdivision Approval
Subject Property
Subsidence
- T -
Taxes
Property
Special Assessments
Temites
Termites
test
Topography
Transportation
- U -
Unacceptable Locations
Unacceptable Sites
Under Construction
Underground Storage Tanks
Soil Contamination
Unique Property Appraisals
URAR
Section 1 -- Subject
Section 10 -- Income Approach
Section 11 -- PUD Information
Section 2 -- Contract
Section 3 -- Neighborhood
Section 4 -- Site
Section 5 -- Improvements
Section 6 -- Sales Comparison Approach
Section 7 -- Reconciliation
Section 8 -- Additional Comments
Section 9 -- Cost Approach
Utilities
Utilities and Services
- V -
Value Adjustments
Ventilation
- W -
Walls
Lot Line
Party
Water Supply
Water Supply, Individual
Well
Abandoned
Inoperative
Wood Destroying Insects
Wood Structural Components
- Z -
Zoning
|